skulle vi se på BW Energy med et litt kritisk blikk…

så kunne vi spørre ledelsen ved neste kvartalfremleggelse om API-levelen i oljereservoaret de fikk kjøpt til under 2 dollar/pr. fat…

http://www.petroleum.co.uk/api

fant ut etter litt re-search,men da kun for Maromba :“Heavy crude oil at 16 degree API but with low viscosity and sulfurcontent”

:thinking:

jøss,Pareto har ikke vært helt realistiske her med 50 dollar fatet…noe som kan ta nå opptil 2-3 år å nå…

men godt valg alikevel.

1 Like

Vi behøver ikke 300 % akkurat nå ,men iallefall har man tid å posisjonere seg opp når prisen er lav. Så kjøper du BW Energy hver måned i 2 år og oljeprisen går tilbake, har du kanskje en pen gevinst:)

Her er iallefall den betalte rapporten Pareto bruker i sin begrunnelse for sin påstand.

BW Energy.pdf (1,5 MB)

1 Like

Denne rapporten er estimert uten Maromba…og alikevel når den opp til 33,- i verdsettelse…da med 50 dollar fatet,-noe jeg ikke tror vi vil se før om 4 - 5 år?

kjøpt eller ikke kjøpt,så virker denne rapporten troverdig og nøye utført utav den situasjonen selskapet og oljesektoren er i nå og utsiktene virker å ha rot i virkeligheten.

:crossed_fingers: :relaxed: :+1:

Med den massive underinvesteringen vi ser nå i oljen, kan vi i teorien få en spike opp som er mye høyere enn $50f innen 3 år.

Det er ikke nødvendigvis positivt. Dog vil vel fulle lagre skape en forsinkelsesprosess i det scenariet, som kan vare lenge.

1 Like

“Eksperter” har anslått at det vil ta ca. 2 år å “brenne” opp nådagens olje,-og det er med normal livstil vi hadde frem til mars i år,rett før verden gikk i full Lockdown…legg på Coronatiltakene som mest sannsynlig kommer til å vare en god stund til…så er vi oppe i 50 dollar pr fat om hvertfall 3- 4(vi møtes halvveis)…ingen “spike”.

Scenariene er for mange…vi kan spekulere så mye vi måtte orke,-cluet er at BWE står veldig sterkt opp i situasjonen vi ser idag.

1 Like

Har köpt en del BWE, stoppat i en låda & ”kastat nyckeln”. Blir nog bra om nåt år :wink::+1:t2:

2 Likes

https://www.cnbc.com/2020/04/08/oil-surges-8percent-in-sudden-move-toward-the-end-of-trading-us-oil-fund-etf-halted.html

Denne aksjen har nå en P/B 0,68 og P/E på 3,49, var billig i IPO, enda billigere nå. Skal jo være forsiktig med å bruke forholdstall i denne situasjonen, men skal lete lenge etter noen E&P selskaper som er lavere priset. Har også tro på denne blir bra om et par år :+1:

Må informere at de kanskje har en kost på 35 dollar per fat. De taper med andre ord 15 dollar per fat. Så er et long case, bet på oljen og ikke raske penger.

Operasjonelle kostnader ligger rundt $15-$17 fatet nå. Tror ikke resterende kostnader utgjør $20 fatet?

Selskapet guider nemlig en bruttoproduksjon på 16.000-18.500 fat pr. dag fra Dussafu-feltet i 2020. Hvis vi bruker den høye enden av guidingen og deler ut 125 millioner dollar i capex over disse fatene blir investeringene på rett under 20 dollar pr. fat. Legger man til den lave enden av driftskostnadene på 15 dollar er man da oppe i en kostnad på 35 dollar pr. produserte fat.

Fortsetter det ut året er det snakk om en negativ kontantstrøm på 13 dollar pr. fat, eller rundt 65 millioner dollar totalt.

Bra de har $185m cash, og håper de får på plass RBL-fasilitet på $300m snart. Ellers blir caset veldig mye mer usikkert.

1 Like

De har kuttet capex med 20% for 2021 mener jeg!

Borr Drilling Limited - Update on contracts and operations
Borr Drilling Limited (the “Company”) (NYSE: “BORR”, OSE: “BDRILL”) is pleased
to announce that it has been awarded LOAs for work in the Asia Pacific region
for two of its premium jack ups, of which one is a newbuild being activated. The
contracts’ estimated duration, excluding options, will be for 365 days and 200
days respectively. The rigs are expected to commence contracts in the third
quarter of 2020.

The Company has received notices of early termination of contracts from Exxon
Mobil for the rigs “Gerd” and “Groa” which are working in Nigeria under
contracts originally committed until April 2021 and May 2021, respectively. The
contracts for both rigs require 180 days notice for early termination. The
Company is in discussions with Exxon Mobil with regards to planning the
discontinuity of operations for both rigs following the early termination
notices.

The Company has received notice to stop operations for the “Norve”, working in
Gabon for BW Energy. The rig finished operations in early April 2020, around
three months before previously estimated.

The Company has received a notice of early termination for the semi-submersible
“MSS1” which finished its contract on 25 March 2020, one month earlier than
previously estimated. The rig is entitled to an early termination fee as per
contract provisions.

Following its campaign with Neptune, the “Prospector 5” has safely arrived in
Harwich. The Company received notification from its follow-on customer, Perenco,
electing not to proceed with the previously announced contract for the rig. The
rig is scheduled to commence operation for CNOOC in the North Sea between
September and November 2020.

The net impact of the new contracts and the early termination of the existing
contracts is estimated to affect the total revenue backlog negatively by
approximately USD 16 million.

Furthermore, the rigs Odin and Galar have commenced operation for Pemex during
Q1 2020, and the Njord is expected to commence operations with Pemex shortly.
The rig Saga commenced operation in Vietnam for ENI in February 2020.

Borr Drilling is experiencing the impact of current unprecedented market
conditions and the global market reaction to the COVID-19 pandemic, in
particular as a result of the practical issues arising from government-imposed
travel restrictions, border closures and quarantines. Safety is our primary
focus and we have implemented changes to working arrangements to protect
everyone working on our rigs and at our onshore sites. We also respect similar
arrangements put in place by our customers and suppliers to safeguard the safety
and well-being of their personnel. Some of our customers are unable to continue
safe operations in the current circumstances, are experiencing difficulties in
their respective supply chains and have announced cost-saving initiatives.
Further, a number of Customers have contractual rights in place to suspend
operations in certain circumstances, and we could be subject to further
suspension notices in light of market conditions. At this stage the Company
cannot predict with reasonable accuracy the duration of such suspensions if
exercised or the impact on the Company.

The Company is pleased to see that we have managed to keep a solid technical
utilisation for the fleet in these challenging times of 99.5% YTD. The Board and
Management want to thank the organisation for great efforts to meet the many
logistical challenges and keep a safe operation in this difficult environment.

April 13, 2020
Hamilton, Bermuda
Borr Drilling Limited

Feil selskap kjære deg.

Ene riggen som omtales var inntil nylig i bruk av BWE.

Men de kutter capex, og dropper vel både letebrønn på Dussafy, og utsetter intallasjon av de siste brønnene på Tortue-funnet.

1 Like

Det er bra at de sparer på kruttet.