Fant denne her:
leveransemodeller-havvind_marine-operasjoner (1).pdf (2,7 MB)
Blant annet dette er interessant mht. NM:
“Cable lay vessels may be specialised Cable Lay Vessels (CLV) or Offshore Construction Vessels (OCV) with sufficient deck space for one or two carousels. Shall the vessel perform a more
comprehensive part of the scope (e.g. trenching and burial in addition to laying) it also must have sufficient pulling capacity (bollard pull), be equipped with large deck crane, an A-frame
to handle the plough and a ROV with associated launching and control/maintenance equipment. Installation over long distances/many cables will require additional carousels/cargo carrying capacity and bundled lay (simultaneous lay of different cables)
will require split carousels. For work in deep waters, the vessel must be prepared to accommodate a vertical lay tower to ena-
ble sufficient hold-back tension capabilities and avoid excessively small cable bending radius. Cable jointing and equipment
repair work require covered workshop facilities.”